Mid-December 2022 to mid-March 2023 - the river that started it all in the big leagues. Like other Big K attractions, covered in layers of paint and leaked water so badly couldn't maintain correct height even with two wells. Took long time to fill because water had to soak ground around it first. Approximately 6-7 staircases all around, handicap lift room, wave generator interior lined, small splash pad for slide, coping all the way around, 2 LARGE surge tanks, several still-big surge tanks (could comfortably fit 3 people standing), and bunch of rectangular concrete skimmer boxes with pipe in bottom. Trained on this project, managed it, put in countless hours figuring out and designing solutions. Result: watertight, beautiful, long life ahead without annual repainting and crack refilling.
Project deliverables and measurable impact
16,000 sq ft of membrane across 650-ft river
Completed by 2-man crew over 3 months
Chronic leaks resolved at coping, stairs, and walls
Full river fill and circulation restored
Ended yearly repaint cycles permanently
Before, during, and after photos
Challenges and issues identified at project start
Detailed sequence of work completed
Project deliverables and impact
Contractor-level skills and certifications
Project collaboration and partnerships