Project Summary

Two-part emergency repair (June 2024 and March 2025) of membrane staircase system on lazy river. Large concrete slab with 2 slides above staircase held overflow water causing immense water pressure beneath slab. Pressure caused membrane lining river to bulge dangerously, making it unsafe and unusable. Emergency repair during peak season required working while river was full, blocking off and semi-sealing staircase under water while maintaining low profile for thousands of daily guests. Created water pressure equalization system to keep steps and demarcation tight and secure until off-season. Permanent repair after season installed one-way valves and beefy fastener system, then relined stairs for Summer 2025 operation.

Initial Conditions

Challenges and issues identified at project start

  • Large concrete slab with 2 slides holding massive overflow water
  • Immense water pressure seeping under concrete slab
  • Water pressure causing membrane to bulge out insanely
  • Staircase unsafe and unusable due to membrane bulging
  • Risk of entire large membrane river system becoming compromised
  • Water also pouring into road in front of park

Work Performed

Detailed sequence of work completed

  1. Emergency assessment during peak season with river full
  2. Blocked off and semi-sealed staircase (normally underwater)
  3. Constant water pumping while maintaining guest operations
  4. Created water pressure equalization system
  5. Secured steps and demarcation tight to concrete shell
  6. Permanent one-way valve installation (post-season)
  7. Installed beefy under-surface fastener system
  8. Complete staircase relining with new membrane for Summer 2025

Outcomes & Results

Project deliverables and impact

  • Prevented collapse of entire membrane river system
  • Maintained guest safety during emergency
  • Kept river operational through peak season
  • Permanent repair completed - operational for Summer 2025
  • Protected overall membrane integrity from water intrusion behind system

Professional Expertise Demonstrated

Contractor-level skills and certifications

  • Emergency problem-solving under extreme pressure
  • Engineered temporary solution to maintain operations during season
  • Permanent structural and waterproofing solution design
  • High-stakes project management during peak guest operations
  • Creative problem-solving for membrane pressure equalization
  • Underwater work and emergency sealing techniques

Stakeholder Coordination

Project collaboration and partnerships

  • Big Kahuna's facility management during peak operations
  • Coordinated work schedule around thousands of daily guests

Have a Similar Project?

Let's discuss how Torwyn Solutions can help with your commercial pool or waterpark project.

Request Consultation Resources

Looking for similar services?

Membrane Installation & Pool Construction →