Mid-January to first week of April 2025 project showcasing complete skillset. Resting on giant hill, 400+ foot long rapids with two large steep slides, huge curves and humps. Removed 1-foot thick wall foam originally coated in polyurea, up to 3 inches of granule rubber absolutely stuck to floor. Decks and walls rotting away with wood. Pool-like section with rock obstacles completely reframed and reshaped for safety and better flow. Extensive hump reshaping, removed fiberglass from giant slide at end dropping into wading pool. Beautiful decking material for lifeguards (no more splinters or hot feet), rebuilt decks supporting membrane. Rebuilt rotting wood wall with new lower-profile cinder block wall. Power tools used to cut rubber granule into sections and scraped/yanked every bit off. Solid concrete patchwork to fix holes previously covered with more rubber. Coping on both sides - tight membrane coping rarely done by others, mastered by this team. Place unrecognizable by completion.
Project deliverables and measurable impact
10,000+ sq ft resurfaced along 400+ ft river
River widened ~1 ft for improved rider flow
Removed 1.3 tons of deteriorated rubber flooring
Delivered within full off-season construction window
Stabilized substrate; restored full, leak-free operation
Before, during, and after photos
Challenges and issues identified at project start
Detailed sequence of work completed
Project deliverables and impact
Contractor-level skills and certifications
Project collaboration and partnerships