All Projects
Lambert Park Pool — Lane & Dive Pool Full Remodel - commercial aquatic construction by Torwyn Solutions

Lambert Park Pool — Lane & Dive Pool Full Remodel

Martinsburg, WV
May 2022

Project Summary

Two-phase project: 1 week in April and last 2 weeks of May 2022. Full remodel with June opening deadline. Pool had 20-year-old liner and groundwater problem similar to Echo Park. Complete tear-out revealed many big cracks needing mechanical supports before concrete patching. Several skimmer throats and bodies required complete demo and rebuild - ripped out cracked concrete, shaped and repoured square, replaced stone coping. Large staircase, deep end with race lines and wall targets. Custom fittings for various pipes and returns throughout pool.

Initial Conditions

Challenges and issues identified at project start

  • 20-year-old liner requiring replacement
  • Groundwater problem in deep end
  • June opening deadline
  • Many large cracks throughout concrete
  • Several skimmer throats and bodies with cracked concrete
  • Stone coping needing replacement
  • Various pipes and returns with non-standard configurations

Work Performed

Detailed sequence of work completed

  1. Full liner tear-out
  2. Installed mechanical supports to hold large cracks together
  3. Patched all cracks flush with concrete
  4. Demolished cracked skimmer throat concrete
  5. Shaped and repoured skimmer throats square
  6. Replaced skimmer bodies
  7. Replaced stone coping
  8. Installed large staircase with membrane
  9. Completed deep end membrane work
  10. Installed competition race lines
  11. Installed wall targets
  12. Created custom fittings for all different pipes and returns

Outcomes & Results

Project deliverables and impact

  • Pool opened in June as required
  • All structural cracks properly supported and repaired
  • Skimmers rebuilt to proper square shape
  • Groundwater issue resolved
  • Competition-grade race lines and wall targets installed

Professional Expertise Demonstrated

Contractor-level skills and certifications

  • Structural concrete repair with mechanical supports
  • Complete skimmer demolition and reconstruction
  • Groundwater problem diagnosis and remediation
  • Deadline-driven project management
  • Competition pool specifications implementation
  • Custom plumbing fitting fabrication
  • Municipal facility renovation

Stakeholder Coordination

Project collaboration and partnerships

  • Lambert Park management
  • Worker/assistant

Codes & Compliance

Building codes and regulatory standards

  • Competition pool race lines and wall targets
  • Hydrostatic pressure relief for groundwater

Have a Similar Project?

Let's discuss how Torwyn Solutions can help with your commercial pool or waterpark project.

Request Consultation Resources

Looking for similar services?

Membrane Installation & Pool Construction →