The Sands at Lido Beach — Full Pool Tear-Out & Remodel - commercial aquatic construction by Torwyn Solutions

The Sands at Lido Beach — Full Pool Tear-Out & Remodel

Hempstead Town, NY
June 2023

Project Summary

All of June 2023 full remodel of beachside pool in dire need. After site inspection, determined concrete breaking apart due to poor conditions requiring full tear-out with jackhammers and mini excavator. Deep end filled in based on actual use, requiring main drain plumbing redirection to 2 new main drains. Original 30 wall jets had ugly commercial brass shower drain hoppers and 12-inch main drain covers. All skimmers and sidewalk replaced. Custom equalizer plumbing with small VGBA fittings replaced large main drain covers on equalizers. Custom plates with eyeball fittings covered old brass hoppers. Extensive grinding, resurfacing, custom embedded fittings, skimmer throat reforming, all new coping, unique wall-mounted lean-on step, two corner staircases with floor-mounted handrails. Ensured pumps primed correctly given distance and height difference between main drains and pump room.

Key Results

Project deliverables and measurable impact

Rebuilt failing interior; reshaped skimmers and returns

Installed new 4" slab replacing degraded substrate

Achieved full hydraulic and VGBA code compliance

Delivered safer, watertight pool with upgraded supports

Initial Conditions

Challenges and issues identified at project start

  • Pool set right off beach in dire need of remodel
  • Concrete breaking apart due to poor conditions
  • Deep end not needed based on actual use
  • 30 wall jets with ugly commercial brass shower drain hoppers
  • 12-inch main drain covers on all 30 jets (ugly)
  • All skimmers needed replacement
  • Sidewalk needed replacement
  • Equalizers had large main drain covers
  • Pump room far away from pool

Work Performed

Detailed sequence of work completed

  1. Site inspection and assessment
  2. Full tear-out with jackhammers and mini excavator
  3. Removed all bad concrete
  4. Filled in deep end based on use analysis
  5. Redirected plumbing up to 2 new main drains
  6. Removed old sidewalk and skimmers
  7. Installed new correct skimmers
  8. Plumbed all new skimmers with equalizers
  9. Created custom equalizer plumbing with small VGBA fittings
  10. Made custom plates with eyeball fittings for brass hoppers
  11. Extensive grinding of surfaces
  12. Resurfacing with custom embedded fittings
  13. Reformed skimmer throats to proper square shape
  14. Installed all new coping
  15. Lined unique wall-mounted lean-on step
  16. Installed two corner staircases
  17. Mounted handrails to pool floor
  18. Ensured pump priming system worked with height difference

Outcomes & Results

Project deliverables and impact

  • Pool night and day difference from before
  • All jets clean with just white eyeball visible
  • Equalizers properly VGBA compliant with small fittings
  • Pump system functioning correctly despite distance and height
  • Long-term structural solution with bad concrete removed

Professional Expertise Demonstrated

Contractor-level skills and certifications

  • Full pool demolition and excavation
  • Heavy equipment operation (mini excavator)
  • Structural assessment and concrete removal
  • Complete plumbing system redesign and installation
  • VGBA code compliance implementation
  • Custom fabrication of fitting covers and systems
  • Hydraulic system design for pump room distance
  • Multi-phase commercial remodel management

Stakeholder Coordination

Project collaboration and partnerships

  • Beach resort management
  • Part of 3-pool project sequence

Codes & Compliance

Building codes and regulatory standards

  • VGBA compliance for equalizers and fittings
  • Commercial pool main drain requirements

Have a Similar Project?

Let's discuss how Torwyn Solutions can help with your commercial pool or waterpark project.

Request Consultation Resources

Looking for similar services?

Membrane Installation & Pool Construction →