The Newberry — Rooftop Pool Repair & VGBA Compliance - commercial aquatic construction by Torwyn Solutions

The Newberry — Rooftop Pool Repair & VGBA Compliance

New York, NY
November 2022

Project Summary

November 2022 rooftop pool repair addressing bubbles near main drain and tile line caused by improper installation by big-name contractor who glued entire system to metal shell without proper sealing or terminations. Worked with engineer, superintendent, and building board representative to solve brass equalizer fittings, stainless main drain on cold steel shell, missing base padding for staircase, and tile line separation. Created watertight fitting system through bottom floor below shell, cut and prepped tile line, welded PVC sheet buffer pad for steps, and properly waterproofed main drain. Made pool VGBA compliant. Tested shell for corrosion through gel coat for engineer.

Initial Conditions

Challenges and issues identified at project start

  • Small bubbles appearing near main drain and tile line
  • Previous contractor glued entire system to metal shell improperly
  • No sealing around fittings or proper terminations
  • No termination below tile line, at skimmers, equalizers, or main drain
  • Brass equalizer fittings on cold steel shell
  • Stainless main drain improperly installed
  • No base padding for set-in staircase
  • Separation below tile line
  • Pool not VGBA compliant

Work Performed

Detailed sequence of work completed

  1. Walked engineer, superintendent, and building board through all issues
  2. Drilled out old brass fittings
  3. Created watertight fitting system installed through bottom floor below shell
  4. Engineered fittings to handle pressure and achieve VGBA compliance
  5. Cut bottom of old tile line
  6. Prepped and fixed weak tile line sections
  7. Welded large PVC sheet to shell as buffer pad for steps
  8. Covered buffer pad with membrane
  9. Properly waterproofed main drain by replacing part of glued liner
  10. Tested shell for corrosion through gel coat at various locations for engineer
  11. Received engineer approval for all solutions

Outcomes & Results

Project deliverables and impact

  • Bubble issues resolved
  • Pool made VGBA compliant
  • All terminations properly sealed and watertight
  • Staircase properly supported with buffer pad
  • Tile line structurally sound and sealed
  • Engineer approved all solutions and corrosion testing

Professional Expertise Demonstrated

Contractor-level skills and certifications

  • Complex problem-solving for previous contractor's failures
  • Engineering coordination and approval process
  • VGBA compliance expertise and implementation
  • Custom fabrication of pressure-rated watertight fittings
  • Structural assessment and corrosion testing
  • Multi-stakeholder building management coordination
  • Rooftop/elevated pool specialized knowledge
  • Stainless steel and cold shell installation expertise

Stakeholder Coordination

Project collaboration and partnerships

  • Building engineer
  • Construction superintendent
  • Building board representative

Codes & Compliance

Building codes and regulatory standards

  • VGBA (Virginia Graeme Baker Act) compliance

Have a Similar Project?

Let's discuss how Torwyn Solutions can help with your commercial pool or waterpark project.

Request Consultation Resources

Looking for similar services?

Membrane Installation & Pool Construction →