Main attraction membrane installation on three large concrete slides November 2024-January 2025. People ride tubes down high-speed slide system with many sharp humps and curves, wading areas, and feeding area at top. Extensive grinding to remove thick paint layers, then hundreds of linear feet of coping installation on both sides and between each wall dividing slides. All humps specially designed to not budge, sag or deform with no water weight and constant float impacts. Custom threaded drain ports installed through piping in floor of each flat section for easy off-season drainage. Eliminates annual painting and concrete crack filling.
Project deliverables and measurable impact
325 linear ft of multi-lane runouts resurfaced
Corrected cracking, delamination, coping failures
Tight-fit membrane around complex curves and humps
Fully mechanical fastening for long-term durability
Four-man crew delivered uniform, watertight finish
Before, during, and after photos
Challenges and issues identified at project start
Detailed sequence of work completed
Project deliverables and impact
Contractor-level skills and certifications
Project collaboration and partnerships
Let's discuss how Torwyn Solutions can help with your commercial pool or waterpark project.
Request Consultation ResourcesLooking for similar services?