Big Kahuna's Water & Adventure Park — Rapid Slides Membrane Installation - commercial aquatic construction by Torwyn Solutions

Big Kahuna's Water & Adventure Park — Rapid Slides Membrane Installation

Destin, FL
January 2025

Project Summary

Main attraction membrane installation on three large concrete slides November 2024-January 2025. People ride tubes down high-speed slide system with many sharp humps and curves, wading areas, and feeding area at top. Extensive grinding to remove thick paint layers, then hundreds of linear feet of coping installation on both sides and between each wall dividing slides. All humps specially designed to not budge, sag or deform with no water weight and constant float impacts. Custom threaded drain ports installed through piping in floor of each flat section for easy off-season drainage. Eliminates annual painting and concrete crack filling.

Key Results

Project deliverables and measurable impact

325 linear ft of multi-lane runouts resurfaced

Corrected cracking, delamination, coping failures

Tight-fit membrane around complex curves and humps

Fully mechanical fastening for long-term durability

Four-man crew delivered uniform, watertight finish

Initial Conditions

Challenges and issues identified at project start

  • Three large concrete slides covered in thick layers of paint
  • Many sharp and high-speed bump humps and curves throughout system
  • Wading areas and feeding pound at top with small entrance staircase
  • Required annual painting in off-season
  • Annual concrete crack filling needed

Work Performed

Detailed sequence of work completed

  1. Extensive concrete grinding to remove thick paint layers
  2. Hundreds of linear feet of coping installation combined
  3. Coping on both sides and between each wall dividing slides
  4. Special design for humps to prevent budging, sagging or deforming
  5. Precise installation to handle constant use of floats hitting and sliding off
  6. Navigated many interesting shapes and curves
  7. Custom made threaded drain ports through piping in floor sections
  8. Membrane installation on all wading areas

Outcomes & Results

Project deliverables and impact

  • No more annual painting required in off-season
  • No more annual concrete crack filling with sealer
  • Easy drainage system for off-season via custom drain ports
  • Humps perfected to not deform with constant use
  • Long-term maintenance reduction

Professional Expertise Demonstrated

Contractor-level skills and certifications

  • Complex waterpark attraction expertise - first of its kind work
  • Advanced concrete surface preparation and grinding
  • Custom fabrication of drainage systems
  • Specialized membrane installation on complex curves and humps
  • Engineering solution for high-impact, high-use waterpark feature
  • Long-term durability design for constant guest use

Stakeholder Coordination

Project collaboration and partnerships

  • Big Kahuna's facility management

Have a Similar Project?

Let's discuss how Torwyn Solutions can help with your commercial pool or waterpark project.

Request Consultation Resources

Looking for similar services?

Membrane Installation & Pool Construction →