One week of labor over several months of plan revisions, finished October 2023. Stainless pool originally designed for tile finish until budget constraints. Contractor had multiple problems: pool built too low below outside floor decking that was supposed to meet pool edge, and needed code-compliant finish on stainless. After revising and resourcing correct materials, fixed height difference issue and waterproofed the pool. Worked during live construction of building being built and furnished. Welded custom logo into floor, lined large staircase, operated JLG Skytrak to move materials/tools/debris from 3rd floor roof. Solutions saved contractor from having to change beams at pool bottom to fix design issues, saving significant money.
Project deliverables and measurable impact
Installed PVC membrane inside stainless-steel shell
Corrected coping and stair heights for code compliance
Welded custom logo panel into pool floor
All work hoisted to active 3rd-floor jobsite
Before, during, and after photos
Challenges and issues identified at project start
Detailed sequence of work completed
Project deliverables and impact
Contractor-level skills and certifications
Project collaboration and partnerships
Building codes and regulatory standards